INTEXT 70 Francis ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Installation of a platform to support an Energy storage system located on the 4th floor terrace. The equipement is to be installed in the future. The platform does not modify the use, fire protection, living space, or exits of the building. Refile of SF890789 which timed-out
- Status
- Prospective
- Sector
- Energy Storage, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 70 Francis ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Installation of a platform to support an Energy storage system located on the 4th floor terrace. The equipement is to be installed in the future. The platform does not modify the use, fire protection, living space, or exits of the building. Refile of SF890789 which timed-out |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
