INTEXT 76-84 Boylston ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Existing facade replacement using cast material from level 3 up to and including the parapet. The cast stone below level 3 will be restored in place. Interior gut renovations will occur on all floors. Interior renovations will occur on floors sub-basement, basement and levels 1-12. A newly constructed 13th floor will be located entirely behind the 14'4" parapet. The current residential student pop
- Status
- Prospective
- Sector
- Commercial, Education, Residential, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT 76-84 Boylston ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Existing facade replacement using cast material from level 3 up to and including the parapet. The cast stone below level 3 will be restored in place. Interior gut renovations will occur on all floors. Interior renovations will occur on floors sub-basement, basement and levels 1-12. A newly constructed 13th floor will be located entirely behind the 14'4" parapet. The current residential student population of 750 will increase to 1,044 residential students. There will be new mechanical, electrical and fire protection systems installed. *CORRECTION 8.8.19; (1041 BEDS) ; *S*Smoke Control Affidavit needed-See Cheryl Odom* Control Affidavit- See Cheryl Odom* |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Residential, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
