logo
ProjectOpenBP

INTEXT 815 Centre ST

Open · Massachusetts

Source: City of Boston

• Demo all existing porch structure excluding roof structure and support roof where needed , dispose of all waste created during project • Remove existing footings • Set and pour 3 new footings consisting of 28”x28” big foot, 12” sona tube, and rebar • Cold pack asphalt around new footings • Reframe all three deck levels; using #1 pressure treated 2”x8” joist, 6”x8” beams, 6”x6” posts. • Jois

Status
Prospective
Sector
Road, Water Supply and Storage, Steel, Commercial, Government
Location
Jamaica Plain, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTEXT 815 Centre ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTEXT 815 Centre ST” is an infrastructure initiative in the Road sector, located in Jamaica Plain, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

• Demo all existing porch structure excluding roof structure and support roof where needed , dispose of all waste created during project • Remove existing footings • Set and pour 3 new footings consisting of 28”x28” big foot, 12” sona tube, and rebar • Cold pack asphalt around new footings • Reframe all three deck levels; using #1 pressure treated 2”x8” joist, 6”x8” beams, 6”x6” posts. • Joist will be hung with LUC28Z Simpson concealed flange joist hangers, painted black • Connection between 6x6 post and 6x8 beams with be made with ECCL and CCT Simpson post caps, painted black, galvanized ½” lag bolts • Top surface of all joist and beams to be covered with self-sealing ice and water membrane • Install Tongue and Groove decking on all three levels (IPE) • Install railings on each level with middle post to decrease railing span, railing set at 42” of deck center post 48” off deck (Mahogany) • Build center dividing wall between units on each second and third floor, using 5/8”x 4” beaded primed before installation.) • Build new stairs and trim with cellular PVC risers and 1x4” IPE treads • Prime and paint all framing and railings

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Jamaica Plain

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Steel, Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project