INTEXT
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Creation Iron Design will repair both front and rear fire escapes per Section 1001.3.1, replace all bolts, secure railings, remove rust/loose paint, repaint for durability, obtain permits, and provide a 5-year Fire Escape Certificate filed with Boston ISD.
- Status
- Prospective
- Sector
- Metal, Commercial, Government, Steel
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTEXT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Creation Iron Design will repair both front and rear fire escapes per Section 1001.3.1, replace all bolts, secure railings, remove rust/loose paint, repaint for durability, obtain permits, and provide a 5-year Fire Escape Certificate filed with Boston ISD. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Government, Steel |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
