Intisar-Brega Gas Pipeline Trial Run
Sector: Oil and Gas • Location: Libya
Source: Megaproject
Libya's National Oil Corporation (NOC) has commenced trial operations of a critical 80-mile, 42-inch gas pipeline connecting the Intisar A/103 field to the Brega gas distribution network. The project aims to stabilize domestic energy supplies, recover approximately 150 million cubic feet of gas per day previously lost to flaring, eliminate back pressure in the system, and boost exports to Europe v
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- Libya
- Updated
- 22 Jul 2026
- Source
- Megaproject
ConstructChat
Ask ConstructChat about Intisar-Brega Gas Pipeline Trial Run
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | trial operation |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Libya's National Oil Corporation (NOC) has commenced trial operations of a critical 80-mile, 42-inch gas pipeline connecting the Intisar A/103 field to the Brega gas distribution network. The project aims to stabilize domestic energy supplies, recover approximately 150 million cubic feet of gas per day previously lost to flaring, eliminate back pressure in the system, and boost exports to Europe via the Greenstream pipeline to Italy by the early 2030s. |
Original sector | Oil & Gas |
Location
Country | Libya |
Source
Source | Megaproject |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-04-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
