logo

Intisar-Brega Gas Pipeline

Sector: Oil and Gas • Location: Brega, Libya

Source: Pipeline Technology Journal

Project
Trial Operation

An 80-mile, 42-inch gas pipeline connecting the Intisar A/103 field to the Brega gas distribution network in Libya. The project aims to stabilize domestic energy supplies, recover gas previously lost to flaring, eliminate back pressure in the system, and boost gas exports to Europe.

Status
Under Construction
Sector
Oil and Gas
Location
Brega, Libya
Updated
22 Jul 2026
Source
Pipeline Technology Journal

ConstructChat

Ask ConstructChat about Intisar-Brega Gas Pipeline

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Intisar-Brega Gas Pipeline” is an infrastructure initiative in the Oil and Gas sector, located in Brega, Libya. Taiyo aggregates data on it from Pipeline Technology Journal.

Participants

Not available for this record.

Status

Original status

trial operation

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

An 80-mile, 42-inch gas pipeline connecting the Intisar A/103 field to the Brega gas distribution network in Libya. The project aims to stabilize domestic energy supplies, recover gas previously lost to flaring, eliminate back pressure in the system, and boost gas exports to Europe.

Original sector

Energy

Location

Country

Libya

City

Brega

Source

Source

Pipeline Technology Journal

URL

More Details

Record type

Project

Sector

Oil and Gas

Article published date

2026-04-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project