INTREN 10 Ashmont ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Remodel existing bedroom into new full bathroom.Replace existing window with same size new window.Install new skylight.Insulate all exterior walls with icynene insulation.New blueboard and plaster.New Trim.New bathroom fixtures. Remodel existing livingroom to repair ice dam damage.Insulate exterior walls with icynene insulation.New blueboard and plaster.New trim.
- Status
- Prospective
- Sector
- Hydro, Commercial, Government, Water Supply and Storage
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 10 Ashmont ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remodel existing bedroom into new full bathroom.Replace existing window with same size new window.Install new skylight.Insulate all exterior walls with icynene insulation.New blueboard and plaster.New Trim.New bathroom fixtures. Remodel existing livingroom to repair ice dam damage.Insulate exterior walls with icynene insulation.New blueboard and plaster.New trim. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Hydro, Commercial, Government, Water Supply and Storage |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in United States of America
- SR 55 @ CLARKS MILLPOND DAM
- I-90 Keechelus Dam to Stampede Pass Phase 2A
- I-90 Snowshed to Keechelus Dam Phase 1C
- BUSH FIELD - LOCK AND DAM ROAD
- SR 9 FM S OF BUFORD DAM RD TO PIRKLE FERRY RD
- Contract to revamp Anderson's Dam together with the Valley Water District, near two fault lines in Santa Clara County, California (United States)
- Intake works, construction of wells and conduction of the hydraulic circuit in the Chira and Soria dams, in Gran Canaria (Spain)
- CR 742/BASS ROAD FROM PROVIDENCE BLVD TO NEW FORSYTH ROAD
