INTREN 112 H ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
The Contractor shall remove and dispose of the existing kitchen cabinets in all three (3) kitchens, and supply and install new cabinetry in all three (3) kitchens. The Contractor shall provide the labor and materials to paint the interior walls, ceilings and trim of the existing first floor, second floor and third floor. The Contractor shall supply and install new tile in all three (3) bathrooms.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- South Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 112 H ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall remove and dispose of the existing kitchen cabinets in all three (3) kitchens, and supply and install new cabinetry in all three (3) kitchens. The Contractor shall provide the labor and materials to paint the interior walls, ceilings and trim of the existing first floor, second floor and third floor. The Contractor shall supply and install new tile in all three (3) bathrooms. The Contractor shall re-finish all existing hardwood floors. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | South Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
