logo
ProjectOpenBP

INTREN 150 Third AV

One of 10,000+ projects Taiyo tracks in Massachusetts.

Source: City of Boston

removing non bearing walls ceiling grid and tiles Build glass interior partition approx, 14 lin. ft. build metal studs and 5/8" drywall partition approx. 12' Repair ceiling grid and tiles approx. 260 sq. ft. Relocate wall cabinets, install two metal door units to match existing.

Status
Prospective
Sector
Metal, Commercial, Government
Location
Charlestown, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTREN 150 Third AV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTREN 150 Third AV” is an infrastructure initiative in the Metal sector, located in Charlestown, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

removing non bearing walls ceiling grid and tiles Build glass interior partition approx, 14 lin. ft. build metal studs and 5/8" drywall partition approx. 12' Repair ceiling grid and tiles approx. 260 sq. ft. Relocate wall cabinets, install two metal door units to match existing.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Charlestown

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Metal, Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project