INTREN 151 Tremont ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Remove bathroom outfit in (2) unit bathroom(s) with exception to (1)bath tub. Install new gypsum board, tile, paint and new fixtures. Construct (1) non loadbearing partition with pocket doors, in place where previous partition existed creating 2nd bedroom. This puts the unit back to original configuration.
- Status
- Prospective
- Sector
- Commercial, Government, Manufacturing (Industrial)
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 151 Tremont ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove bathroom outfit in (2) unit bathroom(s) with exception to (1)bath tub. Install new gypsum board, tile, paint and new fixtures. Construct (1) non loadbearing partition with pocket doors, in place where previous partition existed creating 2nd bedroom. This puts the unit back to original configuration. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
