logo
ProjectOpenBP

INTREN 170 Tremont ST

The status, timeline and source of this project. A free account opens every field.

Source: City of Boston

Unit 1504: fill in existing door path between hall and guest bath and make new passage through guest bathroom. kitchen, Remove, dispose and replace with new existing tile, Remove, dispose and replace with new all cabinets in kitchen area, Remove, dispose and replace with new all appliances using a MA licensed plumber, make a opening view on partition wall in kitchen area. Guest Bathroom, Properly

Status
Prospective
Sector
Commercial, Government
Location
Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTREN 170 Tremont ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTREN 170 Tremont ST” is an infrastructure initiative in the Commercial sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Unit 1504: fill in existing door path between hall and guest bath and make new passage through guest bathroom. kitchen, Remove, dispose and replace with new existing tile, Remove, dispose and replace with new all cabinets in kitchen area, Remove, dispose and replace with new all appliances using a MA licensed plumber, make a opening view on partition wall in kitchen area. Guest Bathroom, Properly remove and dispose existing bathtub and replace with new. Remove and dispose existing floor tile and replace it with new. Remove, dispose and replace with new all plumbing fixtures. Install new exhaust ceiling fan. Install new vanity cabinet. Remove, dispose and install new ceramic tile work on tub surrounds. Remove and install new bathroom accessories. Master Bathroom Properly remove and dispose existing bathtub and replace with shower stall adding new steam shower device. Remove and dispose existing floor tile and replace it with new. Remove, dispose and replace with new all plumbing fixtures. Install new vanity cabinet. Remove, dispose and install new ceramic tile work on tub surrounds. Remove and install new bathroom accessories. General Work Area Flooring Remove, dispose and replace existing hardwood flooring with new engineered floating floor in living room, master bedroom, second bedroom and hallways. Install new radiant floor mat system underneath engineered hardwood floor on living room are and master bedroom. Carpentry and Millwork Remove, dispose all existing interior doors and frames and replace with new including trim casing work. Painting, Prep and paint all walls, ceiling and new trim work. Final Cleaning, Full final cleaning work after work completion.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project