INTREN 170 Tremont ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Unit 1504: fill in existing door path between hall and guest bath and make new passage through guest bathroom. kitchen, Remove, dispose and replace with new existing tile, Remove, dispose and replace with new all cabinets in kitchen area, Remove, dispose and replace with new all appliances using a MA licensed plumber, make a opening view on partition wall in kitchen area. Guest Bathroom, Properly
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 170 Tremont ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Unit 1504: fill in existing door path between hall and guest bath and make new passage through guest bathroom. kitchen, Remove, dispose and replace with new existing tile, Remove, dispose and replace with new all cabinets in kitchen area, Remove, dispose and replace with new all appliances using a MA licensed plumber, make a opening view on partition wall in kitchen area. Guest Bathroom, Properly remove and dispose existing bathtub and replace with new. Remove and dispose existing floor tile and replace it with new. Remove, dispose and replace with new all plumbing fixtures. Install new exhaust ceiling fan. Install new vanity cabinet. Remove, dispose and install new ceramic tile work on tub surrounds. Remove and install new bathroom accessories. Master Bathroom Properly remove and dispose existing bathtub and replace with shower stall adding new steam shower device. Remove and dispose existing floor tile and replace it with new. Remove, dispose and replace with new all plumbing fixtures. Install new vanity cabinet. Remove, dispose and install new ceramic tile work on tub surrounds. Remove and install new bathroom accessories. General Work Area Flooring Remove, dispose and replace existing hardwood flooring with new engineered floating floor in living room, master bedroom, second bedroom and hallways. Install new radiant floor mat system underneath engineered hardwood floor on living room are and master bedroom. Carpentry and Millwork Remove, dispose all existing interior doors and frames and replace with new including trim casing work. Painting, Prep and paint all walls, ceiling and new trim work. Final Cleaning, Full final cleaning work after work completion. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
