INTREN 19 Tennis RD
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
To remove sheetrock and flooring on third floor room. To change windows and frame in a walk in closet and area for future bathroom. To ass secondary collar ties to bring ceiling height down. Blueboard and plaster then install trim and pergo floor. New lighting and HVAC to be installed.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Mattapan, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 19 Tennis RD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | To remove sheetrock and flooring on third floor room. To change windows and frame in a walk in closet and area for future bathroom. To ass secondary collar ties to bring ceiling height down. Blueboard and plaster then install trim and pergo floor. New lighting and HVAC to be installed. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Mattapan |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
