INTREN 194 Marion ST
Sector: Commercial • Location: East Boston, Massachusetts, United States of America
Source: City of Boston
Complete Gut of 1st and 3rd Floor and 2nd floor bathroom. Repair any Rotted Structural. Install Various LVL's and wall removal according to Plans. Bring Electrical up to Code. Bring Plumbing up to Code. Check Drainage. Convert from 1 Bedrooms into 2 Bedrooms. Install Interconnected fire alarm system. Firestop each floor. Drywall, Paint and Finish Carpentry.
- Status
- Prospective
- Sector
- Commercial, Government, Waste Processing and Treatment
- Location
- East Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 194 Marion ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Complete Gut of 1st and 3rd Floor and 2nd floor bathroom. Repair any Rotted Structural. Install Various LVL's and wall removal according to Plans. Bring Electrical up to Code. Bring Plumbing up to Code. Check Drainage. Convert from 1 Bedrooms into 2 Bedrooms. Install Interconnected fire alarm system. Firestop each floor. Drywall, Paint and Finish Carpentry. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | East Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Waste Processing and Treatment |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
