logo
ProjectOpenBP

INTREN 208 L ST

Sector: Airport • Location: South Boston, Massachusetts, United States of America

Source: City of Boston

SCOPE OF RENOVATION:

Replace 2 existing Andersen single pane wood casement windows with 2 Harvey Majesty casement windows of the same size. The Harvey Majesty casement windows are energy star rated with an STC of 40. The intent is to lessen the noise from Jet Aircraft taking off and landing at Logan Airport. The existing casement windows are located in the east facing wall of the 1st floor kitche

Status
Prospective
Sector
Airport, Aerospace & Defense, Chemical (Industrial), Manufacturing (Industrial), Commercial, Government
Location
South Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTREN 208 L ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTREN 208 L ST” is an infrastructure initiative in the Airport sector, located in South Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

SCOPE OF RENOVATION: Replace 2 existing Andersen single pane wood casement windows with 2 Harvey Majesty casement windows of the same size. The Harvey Majesty casement windows are energy star rated with an STC of 40. The intent is to lessen the noise from Jet Aircraft taking off and landing at Logan Airport. The existing casement windows are located in the east facing wall of the 1st floor kitchen. The kitchen is currently being renovated under Boston Inspectional Services Department Permit Number SF371622. The proposed work will proceed as follows: 1. Replace 2 existing Andersen single pane wood casement windows with 2 new construction Harvey Majesty casement windows. The Harvey Majesty windows will be made to fit the existing rough opening. The exterior nailing flange will be sealed with Harvey peal and stick rubber as per the Harvey window installation instructions. The existing vinyl siding will be re-installed. 2. Apply non-expanding foam insulation between the existing rough opening and the new casement windows. 3. Insulate the wall cavities around the two new casement windows with ROXUL rock wool insulation (R-13). 4. Cover the ROXUL rock wool insulation with a 4 mil polyethylene vapor barrier stapled to the existing studs. Tape seams as required. 5. Replace the existing Plaster Board (Blue Board) with 1 layer of ½” Homasote 440 Sound Board under 1 layer of ½” Plaster Board. Apply skin coat of plaster to the new blue board to match existing kitchen walls. The existing wall board was installed over the old lathes the Homasote and blue board combination will be the same thickness as the old wall.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

South Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Airport, Aerospace & Defense, Chemical (Industrial), Manufacturing (Industrial), Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project