INTREN 211 Baker ST
Open · Massachusetts
Source: City of Boston
Replace drywall from floor 24” up on affected interior walls: Replace kitchen cabinets, counter top and tiled back splash: Replace bathroom vanity combo, toilet, tile tub wall tile and floor tile: Replace door trim and baseboard moldings: Install new engineered wood flooring throughout unit: Painting of walls, ceilings, doors, door trim and base board moldings. Update plumbing to current code: Upd
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- West Roxbury, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 211 Baker ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replace drywall from floor 24” up on affected interior walls: Replace kitchen cabinets, counter top and tiled back splash: Replace bathroom vanity combo, toilet, tile tub wall tile and floor tile: Replace door trim and baseboard moldings: Install new engineered wood flooring throughout unit: Painting of walls, ceilings, doors, door trim and base board moldings. Update plumbing to current code: Update electrical to current code. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | West Roxbury |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
