INTREN 22 Mountain AV
Sector: Commercial • Location: Dorchester, Massachusetts, United States of America
Source: City of Boston
3 bathrooms, tub to shower 30x60 in 1st and 3rd bathroom, remove and install LVT flooring in all 3 bathrooms, remove and install 3 new toilets, remove and install 2 vanity, storage shelves in both showers, safety bars in both showers, tile the wet and dry area in all 3 bathrooms, measurements on sketches, footprint will be remaining the same and no structural changes for any of the 3 bathrooms.;
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 22 Mountain AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | 3 bathrooms, tub to shower 30x60 in 1st and 3rd bathroom, remove and install LVT flooring in all 3 bathrooms, remove and install 3 new toilets, remove and install 2 vanity, storage shelves in both showers, safety bars in both showers, tile the wet and dry area in all 3 bathrooms, measurements on sketches, footprint will be remaining the same and no structural changes for any of the 3 bathrooms.; |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
