INTREN 23 Hildreth ST
Sector: Water Supply and Storage • Location: Dorchester, Massachusetts, United States of America
Source: City of Boston
Renovations due to waterdamage from pipes. 1st, 2nd and 3rd Floor Front Right Bedroom and Hallway, 1st floor middle left bedroom Remove drywall/sheetrock ceiling ½. Remove drywall/sheetrock wall ½ fit. Remove combination base 3 ½, 2 piece pine. Remove ceiling fixture average quality. Remove/reset door trim 4 ½, 1 side. Remove floor oak 2 ¼ Cl/sel. Remove drywall/sheetrock ceiling ½. Replace drywal
- Status
- Prospective
- Sector
- Water Supply and Storage, Hospital, Metal, Commercial, Government, Steel
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 23 Hildreth ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Renovations due to waterdamage from pipes. 1st, 2nd and 3rd Floor Front Right Bedroom and Hallway, 1st floor middle left bedroom Remove drywall/sheetrock ceiling ½. Remove drywall/sheetrock wall ½ fit. Remove combination base 3 ½, 2 piece pine. Remove ceiling fixture average quality. Remove/reset door trim 4 ½, 1 side. Remove floor oak 2 ¼ Cl/sel. Remove drywall/sheetrock ceiling ½. Replace drywall/sheetrock wall ½ fit. Replace combination base 3 ½, 2 piece pine. Replace ceiling fixture average quality. Replace floor oak 2 ¼ Cl/Ssel. Paint ceiling (2 coats, owner’s choice of color).Paint walls (2 coats, owner’s choice of color). Seal and paint combination vase 3 ½ , 2 piece pine. Paint door trim. Paint window trim set (avg).Sand and finish floor (3 coats) 1st, 2nd and 3rd Floor Kitchens Remove drywall/sheetrock wall ½ and fit. Remove underlayment lauan ¼. Remove vinyl sheet floor A/Q. Replace drywall/ sheetrock wall ½ and fit. Replace underlayment lauan ¼. Replace vinyl sheet floor A/Q. Remove/reset refrigerator 12 Cf A/Q. Remove/reset gas range. Remove/reset cast iron radiator(s) 1st, 2nd and 3rd Floor Pantries Remove drywall/sheetrock wall ½ and fit. Remove base cabinets A/Q. Remove countertop postformed A/Q. Remove vinyl sheet floor A/Q. Remove underlayment Lauan ¼ . Remove kitchen sink S/Enam Sb W/F. Replace drywall/sheetrock wall ½ and fit. Replace base cabinets A/Q. Replace countertop postformed A/Q. Replace vinyl sheet floor A/Q. Replace underlayment Lauan ¼ . Paint ceiling (2 coats, owners choice of color). Paint wall (2 coats, owners choice of color) 1st, 2nd and 3rd Floor bathrooms Remove lath wall. Remove ceramic tile walls. Remove bathtub fiberglass. Remove toilet/water closet 2 piece. Remove vanity 24. Remove medicine cabinet. Remove underlayment plywood 3/8. Remove door trim. Remove window trim. Remove lath ceiling. Replace plaster walls with blue board. Paint ceilings with (2 coats of paint, owner’s choice). Paint wall(s) with (2 coats of paint, owner’s choice). Replace fiberglass bathtub wall kit. Replace vanity. Replace medicine cabinet. Replace underlayment plywood 3/8 Plumbing and Electrical included on separate contracts |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hospital, Metal, Commercial, Government, Steel |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
