INTREN 25-29 Prince ST
Sector: Commercial • Location: Boston, Massachusetts, United States of America
Source: City of Boston
We propose a stamped structural drawing to support second floor roof temp walls will be installed to support roof where new beams is being installed to take out existing walls that are in line with new beam. Long form permit to be issued. ;All work to be performed will be mechanical connection, prefabbed in shop. no welding on site.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 25-29 Prince ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | We propose a stamped structural drawing to support second floor roof temp walls will be installed to support roof where new beams is being installed to take out existing walls that are in line with new beam. Long form permit to be issued. ;All work to be performed will be mechanical connection, prefabbed in shop. no welding on site. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
