INTREN 25 Holborn ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
remove old doors and door trim and replace with new pre-hung doors. Remove old windown trims with new window trims. Replace old base board with new base board. Change carpet in three bedrooms to hardwood floor. Sand and refinish hardwood floor in 3 bedroom rooms and hallway and stairs as needed. Repair damaged wall and ceiling. Add insulation in attic. Paint all the walls in bedrooms.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 25 Holborn ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | remove old doors and door trim and replace with new pre-hung doors. Remove old windown trims with new window trims. Replace old base board with new base board. Change carpet in three bedrooms to hardwood floor. Sand and refinish hardwood floor in 3 bedroom rooms and hallway and stairs as needed. Repair damaged wall and ceiling. Add insulation in attic. Paint all the walls in bedrooms. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
