logo
ProjectOpenBP

INTREN 280 Temple ST

The status, timeline and source of this project. A free account opens every field.

Source: City of Boston

Existing unfinished attic to be finished as master suite with new HVAC system to also supply first floor. Stair to attic to be opened up and rebuilt to code. Wall at bottom of stair to be opened up with structural beam installed. No basement work shown in plan to be done as of 10/14. [ePlans]

Status
Prospective
Sector
Commercial, Government
Location
West Roxbury, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTREN 280 Temple ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTREN 280 Temple ST” is an infrastructure initiative in the Commercial sector, located in West Roxbury, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Existing unfinished attic to be finished as master suite with new HVAC system to also supply first floor. Stair to attic to be opened up and rebuilt to code. Wall at bottom of stair to be opened up with structural beam installed. No basement work shown in plan to be done as of 10/14. [ePlans]

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

West Roxbury

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project