logo
ProjectOpenBP

INTREN 286 Beacon ST

The status, timeline and source of this project. A free account opens every field.

Source: City of Boston

Opening up of non-load bearing wall between kitchen and living room area and replacement of two old kitchen wall cabinets with new ones from Ikea. Phase #1 • Demolish plaster from existing door way. • Remove existing trim around door way. • Temporary support main ceiling with temporary 2/4 wall. • Carefully remove existing support studs. • Open up existing wall to kitchen area. • Install new doubl

Status
Prospective
Sector
Commercial, Government
Location
Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTREN 286 Beacon ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTREN 286 Beacon ST” is an infrastructure initiative in the Commercial sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Opening up of non-load bearing wall between kitchen and living room area and replacement of two old kitchen wall cabinets with new ones from Ikea. Phase #1 • Demolish plaster from existing door way. • Remove existing trim around door way. • Temporary support main ceiling with temporary 2/4 wall. • Carefully remove existing support studs. • Open up existing wall to kitchen area. • Install new double micro laminated 2/12 beam. • Bolt beam 16” OC with structural hex bolts. • Install vertical supports transferring weight load to existing beam under floor line. • Create new kitchen bar 42 inches in height. • Install plaster board where needed. • Install corner bead on all face edges. • Professionally skim coat all surfaces with veneer plaster compound and blend to existing wall surfaces • Prime and paint to match existing wall color Phase #2 • Remove upper existing wall cabinets. • Prepare new space. • Cut right hand cabinet for vent duct. • Repair new cabinet and strengthen where needed. • Install new upper cabinets. • Remove crown molding if interfering with panels. • Install new framing and pad out existing panels. • New panels will be flush and square with lower cabinet doors. • Install new panels and fix from inner side of existing cabinets. • Cut panels around existing vent.; Unit 7

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project