INTREN 286 Beacon ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Opening up of non-load bearing wall between kitchen and living room area and replacement of two old kitchen wall cabinets with new ones from Ikea. Phase #1 • Demolish plaster from existing door way. • Remove existing trim around door way. • Temporary support main ceiling with temporary 2/4 wall. • Carefully remove existing support studs. • Open up existing wall to kitchen area. • Install new doubl
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 286 Beacon ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Opening up of non-load bearing wall between kitchen and living room area and replacement of two old kitchen wall cabinets with new ones from Ikea. Phase #1 • Demolish plaster from existing door way. • Remove existing trim around door way. • Temporary support main ceiling with temporary 2/4 wall. • Carefully remove existing support studs. • Open up existing wall to kitchen area. • Install new double micro laminated 2/12 beam. • Bolt beam 16” OC with structural hex bolts. • Install vertical supports transferring weight load to existing beam under floor line. • Create new kitchen bar 42 inches in height. • Install plaster board where needed. • Install corner bead on all face edges. • Professionally skim coat all surfaces with veneer plaster compound and blend to existing wall surfaces • Prime and paint to match existing wall color Phase #2 • Remove upper existing wall cabinets. • Prepare new space. • Cut right hand cabinet for vent duct. • Repair new cabinet and strengthen where needed. • Install new upper cabinets. • Remove crown molding if interfering with panels. • Install new framing and pad out existing panels. • New panels will be flush and square with lower cabinet doors. • Install new panels and fix from inner side of existing cabinets. • Cut panels around existing vent.; Unit 7 |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
