INTREN 291 Independence DR
Open · Massachusetts
Source: City of Boston
Pharmacy expansion(add 140sf). Removal of non-load bearing partition along the Pharmacy perimeter. Addition of new non-load bearing partition. Remove existing service counter and windows. Add New service counter and windows. Adjust light fixture(s) as required to accommodate new construction. Remove power from existing wall and move to new wall.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- West Roxbury, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 291 Independence DR
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Pharmacy expansion(add 140sf). Removal of non-load bearing partition along the Pharmacy perimeter. Addition of new non-load bearing partition. Remove existing service counter and windows. Add New service counter and windows. Adjust light fixture(s) as required to accommodate new construction. Remove power from existing wall and move to new wall. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | West Roxbury |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
