logo
ProjectOpenBP

INTREN 3 Myrtle ST

Open · Massachusetts

Source: City of Boston

Remove and replace existing interior front entrance door. The new door to match existing shape, design, style and color. Prime and paint new door. Replace existing rubber washing machine supply line hoses with new stainless steel supply hoses. Replace existing dryer vent duct with new metal dryer vent duct.

Status
Prospective
Sector
Steel, Metal, Commercial, Government
Location
Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTREN 3 Myrtle ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTREN 3 Myrtle ST” is an infrastructure initiative in the Steel sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Remove and replace existing interior front entrance door. The new door to match existing shape, design, style and color. Prime and paint new door. Replace existing rubber washing machine supply line hoses with new stainless steel supply hoses. Replace existing dryer vent duct with new metal dryer vent duct.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Steel, Metal, Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project