INTREN 330 Beacon ST
Sector: Residential • Location: Boston, Massachusetts, United States of America
Source: City of Boston
Apartment C-115 RE: Proposal for Guest and Master Bathroom Renovations Guest Bathroom: - Gut entire bathroom – remove existing tub, sink and toilet. - All debris will be disposed of in a safe and proper manner. - Existing plumbing, electrical and venting systems will be reused if possible. - A plumber will be used to install new tub, sink and toilet. - An electrician will do all necessary work for
- Status
- Prospective
- Sector
- Residential, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 330 Beacon ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Apartment C-115 RE: Proposal for Guest and Master Bathroom Renovations Guest Bathroom: - Gut entire bathroom – remove existing tub, sink and toilet. - All debris will be disposed of in a safe and proper manner. - Existing plumbing, electrical and venting systems will be reused if possible. - A plumber will be used to install new tub, sink and toilet. - An electrician will do all necessary work for new lights and mirror. - Use as much space as possible for ceiling height and walls. - Reinforce all necessary walls and ceiling frame. - Insulate walls - Install WonderBoard inside tub area. - Tape corners and waterproof. - Install Blueboard on ceiling and remaining walls – prep for plaster. - Install tile in side tub area and on bathroom floor. Master Bathroom - Gut entire bathroom, except shower. - All debris will be disposed of in a safe and proper manner. - Existing plumbing, electrical and venting systems will be reused if possible. - A plumber will be used to install new tub, sink and toilet. - An electrician will do all necessary work for new lights and mirror. - Use as much space as possible for ceiling height and walls. - Reinforce all necessary walls and ceiling frame. - Insulate walls - Install Blueboard on ceiling and remaining walls and prep for plaster. - Install new floor tile. interior only |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
