logo
ProjectOpenBP

INTREN 330 Beacon ST

Sector: Residential • Location: Boston, Massachusetts, United States of America

Source: City of Boston

Apartment C-115 RE: Proposal for Guest and Master Bathroom Renovations Guest Bathroom: - Gut entire bathroom – remove existing tub, sink and toilet. - All debris will be disposed of in a safe and proper manner. - Existing plumbing, electrical and venting systems will be reused if possible. - A plumber will be used to install new tub, sink and toilet. - An electrician will do all necessary work for

Status
Prospective
Sector
Residential, Commercial, Government
Location
Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTREN 330 Beacon ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTREN 330 Beacon ST” is an infrastructure initiative in the Residential sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Apartment C-115 RE: Proposal for Guest and Master Bathroom Renovations Guest Bathroom: - Gut entire bathroom – remove existing tub, sink and toilet. - All debris will be disposed of in a safe and proper manner. - Existing plumbing, electrical and venting systems will be reused if possible. - A plumber will be used to install new tub, sink and toilet. - An electrician will do all necessary work for new lights and mirror. - Use as much space as possible for ceiling height and walls. - Reinforce all necessary walls and ceiling frame. - Insulate walls - Install WonderBoard inside tub area. - Tape corners and waterproof. - Install Blueboard on ceiling and remaining walls – prep for plaster. - Install tile in side tub area and on bathroom floor. Master Bathroom - Gut entire bathroom, except shower. - All debris will be disposed of in a safe and proper manner. - Existing plumbing, electrical and venting systems will be reused if possible. - A plumber will be used to install new tub, sink and toilet. - An electrician will do all necessary work for new lights and mirror. - Use as much space as possible for ceiling height and walls. - Reinforce all necessary walls and ceiling frame. - Insulate walls - Install Blueboard on ceiling and remaining walls and prep for plaster. - Install new floor tile. interior only

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Residential, Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project