INTREN 330 Washington ST
Sector: Commercial • Location: Boston, Massachusetts, United States of America
Source: City of Boston
In existing spa space demo/removal of ceramic flooring, foot spas and massage rooms with sinks, furred out walls and drywall soffits, sprinkler heads to be turned up in demolished ceilings, plumbing, electrical, build out of 1 restroom on the 2nd floor. No fire alarm
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 330 Washington ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | In existing spa space demo/removal of ceramic flooring, foot spas and massage rooms with sinks, furred out walls and drywall soffits, sprinkler heads to be turned up in demolished ceilings, plumbing, electrical, build out of 1 restroom on the 2nd floor. No fire alarm |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
