logo
ProjectOpenBP

INTREN 342 Bunker Hill ST

Open · Massachusetts

Source: City of Boston

Overall: Permits & Inspections: Building permit, electrical, plumbing, inspection visits, insurance certificates Sanitation: Dumpster located off or on site at an approved location Equipment: 1 to 3 job boxes (3' x 4' x 4' tall), located on site at an approved location Storage container: Size and need will be determined, located on site at an approved location Deliveries: Accept all deliveries and

Status
Prospective
Sector
Hospital, Commercial, Government
Location
Charlestown, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTREN 342 Bunker Hill ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTREN 342 Bunker Hill ST” is an infrastructure initiative in the Hospital sector, located in Charlestown, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Overall: Permits & Inspections: Building permit, electrical, plumbing, inspection visits, insurance certificates Sanitation: Dumpster located off or on site at an approved location Equipment: 1 to 3 job boxes (3' x 4' x 4' tall), located on site at an approved location Storage container: Size and need will be determined, located on site at an approved location Deliveries: Accept all deliveries and put material in approved location Clean up: All work areas shall be broom cleaned and organized before leaving daily Work hours: Start time 8:00 AM, End time 4:00 All items mentioned below are per plans and specifications provided by Duffy Design Group Demolition: Remove existing, wall board, wall framing, coat closet, powder room wall, Kitchen cabinets, countertops, remove flooring where needed, remove tile and plumbing fixtures from guest bathroom, reconfigure wall and floor between new dining/study area, reconfigure wall around gas fireplace, remove living room picture moulding, remove bar sink area, remove wall at shower back wall, partial gut of Master bathroom, remove and relocate guest bedroom partition, Framing: Where noted on plans, supply and install studding, back blocking, fire blocking where needed, new interior partition locations, underlayment where needed, reconfigure wall and floor between new dining/study area, coat closet area, column to mirror other, fireplace width, door opening to pantry, move powder room wall father out, new laundry closet, guest bedroom wall at new location, back shower wall at new location Appliances: Supplied by customer, delivered to unit and installed by contractor, refrigerator, dishwasher, electric range, washer, dryer and exhaust hood (research venting to exterior), all units installed per manufactures specifications Electrical: Delete existing electrical where needed, remove and or disconnect existing recessed lighting and switching, rough and finish wiring for, 50 outlets, 3bathroom exhaust fans, 21 ceiling/sconce light fixture locations, 35 recessed light fixtures, 35 dimmers switches supplied by contractor, wire kitchen appliances: stove, dishwasher, garbage disposal, refrigerator, exhaust hood, bathroom exhausts, Blue board and plaster: Supply & install all blue board, cement board, tile underlayment & smooth skim coat plaster where needed, patch all areas affected by remodel Lighting: All non-recessed lighting fixtures supplied by customer and installed by electrician Hvac: Relocate some heating vents if needed Plumbing: Delete existing plumbing, rough plumbing for all new locations, custom shower pan, supply and install of all finish fixtures, 1 valve, 1 shower head, 4 drains, 3 sinks, 3 faucets, 2 toilets, 1 hand held sprayer, new trim pieces where specified, garbage disposal, ice maker hook up, garbage disposal Finishes: Where noted on plans, pre-primed stock to be used at all casings, baseboard and sills New crown moulding in living Room, new pantry door with trim, patch in baseboard, new guest bedroom closet door with trim, relocate Master bedroom closet door, install medicine cabinets, assemble and install all cabinetry, Vanities and install Painting: Supply & install 1 coat of latex primer, 2 coats of finish latex paint. Paint all room effected by construction, entire first floor, 2nd. Flr: Master Bedroom, Guest Bedroom, Master Bathroom, Hallway, walls, ceilings and trim Shower door: Master bathroom location only, 3/8" glass, per elevation plans of Master bath, hardware TBD Tile: Supply and install specified ceramic tile, floor tile, wall tile, shower tile, back splash tile, layout specified by designer Stone Tops with shower threshold: Supply and install specified stone tops; Kitchen countertop 3cm with 4” backsplash, Dining Room stone top 3cm with 4” backsplash, 2 vanity tops 2cm with 3” backsplash, layout specified by designer Supplied by others: Kitchen cabinets Cabinet door pulls Vanity pulls Mirrors Non-Recessed Light fixtures Closet millwork Carpet

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Charlestown

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Hospital, Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project