INTREN 348-352 Congress ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Remove some interior non bearing walls to add pocket doors. Reconfigure closets to allow for new builtin wood paneled closets and shelving for study and bedroom.Replace existing engineered flooring in unit. Install new tile on bathroom floor and wall.Install new eco-smart non-fossile fuel decorative fireplace.Install new marble countertops.Install new lighting for builtins, replace switches with n
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 348-352 Congress ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove some interior non bearing walls to add pocket doors. Reconfigure closets to allow for new builtin wood paneled closets and shelving for study and bedroom.Replace existing engineered flooring in unit. Install new tile on bathroom floor and wall.Install new eco-smart non-fossile fuel decorative fireplace.Install new marble countertops.Install new lighting for builtins, replace switches with newer dimmers.Paint walls and ceilings. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
