logo
ProjectOpenBP

INTREN 352 Beacon ST

Open · Massachusetts

Source: City of Boston

Master: gut bath & bath closets to framing, move shower location to right side of vanity, reclaim shower space for new walk-in closet, keep locations of double vanity and toilet. Install plumbing to accommodate new location of shower and install new double vanity, 2 sinks/faucets, (1) toilet, shower fixtures. Frame wall to divide bath and master bedroom closet. Door to bath will now become the doo

Status
Prospective
Sector
Commercial, Government
Location
Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTREN 352 Beacon ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTREN 352 Beacon ST” is an infrastructure initiative in the Commercial sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Master: gut bath & bath closets to framing, move shower location to right side of vanity, reclaim shower space for new walk-in closet, keep locations of double vanity and toilet. Install plumbing to accommodate new location of shower and install new double vanity, 2 sinks/faucets, (1) toilet, shower fixtures. Frame wall to divide bath and master bedroom closet. Door to bath will now become the door to master walk-in closet. Cut,frame,install pocket door for new entry location to bathroom en suite (to right of master bedroom door, inside) Insulate, fireblock, install plumbing and update electrical to code, install (2) exhaust fans, Wall/tile board, plaster, tile and grout, install finish fixtures and accessories. Install and finish flooring in master closet to match existing. Kitchen: Cut 8’x5’ opening across/above sink side run of cabinets leaving tall double oven, and reframe to create space between dining/kitchen. Replace cooktop with electric stove, remove double oven and build shelving in place of appliance, replace trash compactor with built in unit. Furnish doors for cabinets where appliances have been removed.Remove hardware, disassemble all cabinets, paint and install new hardware. Guest: install (1) sconce over vanity and wire to new switch. Replace vanity, sink, faucet, shower fixtures. Cut, frame and install recessed cabinet over vanity.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project