INTREN 373 Commonwealth AV
Open · Massachusetts
Source: City of Boston
Remove bathroom floor tiles bathroom wall tiles , remove defective plaster from walls and ceiling, bathroom, kitchen den and bedroom and install with new florr and walls tiles for bathroom and install new drywall in areas mentioned, tape compound all joints, prep , sand walls for pianting. Two coats of primer and one coat of finished piant
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 373 Commonwealth AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove bathroom floor tiles bathroom wall tiles , remove defective plaster from walls and ceiling, bathroom, kitchen den and bedroom and install with new florr and walls tiles for bathroom and install new drywall in areas mentioned, tape compound all joints, prep , sand walls for pianting. Two coats of primer and one coat of finished piant |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
