INTREN 414 Rutherford AV
Sector: Consumer Products • Location: Charlestown, Massachusetts, United States of America
Source: City of Boston
Modifications and additions to the existing refirgerated storage for fruits and vegetables. The building use and ocupancy will not change revisions to egress system is minimal. Structural work is limited to support of required refrigeration eguipment, and inulated panels. All electrical, plumbing and fire protection design will be under a separate permit.
- Status
- Prospective
- Sector
- Consumer Products, Commercial, Government
- Location
- Charlestown, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 414 Rutherford AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Modifications and additions to the existing refirgerated storage for fruits and vegetables. The building use and ocupancy will not change revisions to egress system is minimal. Structural work is limited to support of required refrigeration eguipment, and inulated panels. All electrical, plumbing and fire protection design will be under a separate permit. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Charlestown |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
