INTREN 42 Eighth ST
Sector: Commercial • Location: Charlestown, Massachusetts, United States of America
Source: City of Boston
Unit 3210: Remove existing tub;&; install a schluter shower assembly in the master bath. Re- tile the area. In 2nd bath remove existing tub, floor and wall tile,and vanity. Install all new fixtures and floor and wall tile. Relocate the guest room door from the left hand side of a 12 ft wall to the middle of the wall so there is 4 ft of wall space left and right of the door.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Charlestown, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 42 Eighth ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Unit 3210: Remove existing tub;&; install a schluter shower assembly in the master bath. Re- tile the area. In 2nd bath remove existing tub, floor and wall tile,and vanity. Install all new fixtures and floor and wall tile. Relocate the guest room door from the left hand side of a 12 ft wall to the middle of the wall so there is 4 ft of wall space left and right of the door. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Charlestown |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
