INTREN 48 Cedarwood RD
Open · Massachusetts
Source: City of Boston
Install new kitchen on the first floor. Remove a non bearing wall between the kitchen and dining room. Widen the doorway from the dining room to the entry hall. Reinforce existing beam in the basement to allow relocation of an existing column. Install new windows and a french wood door at the existing porch location. Install a new hydro air system to provide heating and cooling.
- Status
- Prospective
- Sector
- Hydro, Commercial, Government
- Location
- Jamaica Plain, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 48 Cedarwood RD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Install new kitchen on the first floor. Remove a non bearing wall between the kitchen and dining room. Widen the doorway from the dining room to the entry hall. Reinforce existing beam in the basement to allow relocation of an existing column. Install new windows and a french wood door at the existing porch location. Install a new hydro air system to provide heating and cooling. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Jamaica Plain |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Hydro, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in United States of America
- SR 55 @ CLARKS MILLPOND DAM
- I-90 Keechelus Dam to Stampede Pass Phase 2A
- I-90 Snowshed to Keechelus Dam Phase 1C
- BUSH FIELD - LOCK AND DAM ROAD
- SR 9 FM S OF BUFORD DAM RD TO PIRKLE FERRY RD
- Contract to revamp Anderson's Dam together with the Valley Water District, near two fault lines in Santa Clara County, California (United States)
- Intake works, construction of wells and conduction of the hydraulic circuit in the Chira and Soria dams, in Gran Canaria (Spain)
- CR 742/BASS ROAD FROM PROVIDENCE BLVD TO NEW FORSYTH ROAD
