INTREN 55-57 Brimmer ST
Open · Massachusetts
Source: City of Boston
Repair area first floor framing and area of brick sidewall as per engineer's structural plans dated 4/21/11. Also, build new staircase hall at garage level including 2hr fire seperation wall between residence and garage. Relocate existing staircase (between garage level and first floor level) into hall area. Remove existing (garage level ceiling)1/2" GWB and replace with DBL. 5/8" firecode GWB, he
- Status
- Prospective
- Sector
- Commercial, Car parking, Government, Automotive
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 55-57 Brimmer ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Repair area first floor framing and area of brick sidewall as per engineer's structural plans dated 4/21/11. Also, build new staircase hall at garage level including 2hr fire seperation wall between residence and garage. Relocate existing staircase (between garage level and first floor level) into hall area. Remove existing (garage level ceiling)1/2" GWB and replace with DBL. 5/8" firecode GWB, heat, smoke and carbon monoxide detectors. Work according to plans dated 4/21/11 and 5/12/11 |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Government, Automotive |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
