logo
ProjectOpenBP

INTREN 55 Fruit ST

Sector: Power Generation (CCGT) • Location: Boston, Massachusetts, United States of America

Source: City of Boston

Full containment set-up, construction of three chambered decontamination facility, establishment of negative pressure enclosure (exhausting to exterior through White Building 2nd Floor Corridor Window), covering of walls and ceiling with poly sheeting, removal and disposal of carpet and underlying asbestos containing floor mastic from the Dodd Reading Room Area. Mastic to be removed utilizing elec

Status
Prospective
Sector
Power Generation (CCGT), Commercial, Government
Location
Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about INTREN 55 Fruit ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “INTREN 55 Fruit ST” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Full containment set-up, construction of three chambered decontamination facility, establishment of negative pressure enclosure (exhausting to exterior through White Building 2nd Floor Corridor Window), covering of walls and ceiling with poly sheeting, removal and disposal of carpet and underlying asbestos containing floor mastic from the Dodd Reading Room Area. Mastic to be removed utilizing electric floor grinding equipment which will be a noisy/disruptive operation to adjacent spaces. Proposal assumes work to be completed in three phases commencing on Friday Evening (off hours). Walsh Brothers to provide negative air machine exhaust location to exterior, hook-up and disconnect of power panel and pigtail required for mastic grinding equipment (208 Volt, 3 Phase, and 60 Amp). Phase 3 (275A, B, C) Cost: $21,275.00 18-24 Hours to Complete.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project