INTREN 64 W Cedar ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
The bathroom will be remodeled completely. The walls, ceiling, and sub floor will be removed. The plumber will run new drain lines for the toilet, shower, and vanity. A new shower valve, vanity faucet, and toilet water supply lines will also be roughed. The electrician will install all new rough wiring for a GFCI outlet, shower and bathroom lighting, and exhaust fan. The ceiling and wall cavit
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government, Waste Processing and Treatment
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 64 W Cedar ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The bathroom will be remodeled completely. The walls, ceiling, and sub floor will be removed. The plumber will run new drain lines for the toilet, shower, and vanity. A new shower valve, vanity faucet, and toilet water supply lines will also be roughed. The electrician will install all new rough wiring for a GFCI outlet, shower and bathroom lighting, and exhaust fan. The ceiling and wall cavities will be insulated with R-38 and Roxul soundproofing batts respectively. The subfloor will be installed and radiant heating will be installed on top of the subfloor. The PVC shower pan liner will be installed with a cement bed on top of that. The walls and ceiling inside the shower will be covered with 1/2" cement board, and the walls and ceiling outside the shower will be covered with 1/2" blue board and plaster veneer. The shower walls, floor, and bathroom floor will be finished with tile, and the outside walls and ceiling will be painted. The plumber and electrician will do their finish work, and the door and baseboard will be painted and installed. All debris and tools will be removed from the job site. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Waste Processing and Treatment |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
