INTREN 69 Birch ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Install 8 vinyl replacement windows Repair and paint shutters and window trim Paint outside aluminium siding between second and third floors Remove falling plaster and remaining plaster and lathe from ceilings in four bedrooms and hang 5/8ths sheet rock on ceiling, tape, compound, sand and paint Demolish old coal bins in basement, discard into dumpster, remove all other plaster and lathe from bedr
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Car parking, Commercial, Government, Automotive
- Location
- Roslindale, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 69 Birch ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Install 8 vinyl replacement windows Repair and paint shutters and window trim Paint outside aluminium siding between second and third floors Remove falling plaster and remaining plaster and lathe from ceilings in four bedrooms and hang 5/8ths sheet rock on ceiling, tape, compound, sand and paint Demolish old coal bins in basement, discard into dumpster, remove all other plaster and lathe from bedrooms and debris from attic, basement, garage and yard. (Dumpster from United Waste Management Co.) |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Roslindale |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Car parking, Commercial, Government, Automotive |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
