INTREN 695 Atlantic AV
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Renovate two 12'X12' existing ADA bathrooms on the 9th. floor. Layout to remain as is. Work to include: Remove and replace existing wall board, ceramic wall tile and floor tile, ceiling tile and grid system, toilet partitions, counter tops, toilet, sink fixtures and light fixtures. No egress affected, no sprinkler work, no fire alarm work.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 695 Atlantic AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Renovate two 12'X12' existing ADA bathrooms on the 9th. floor. Layout to remain as is. Work to include: Remove and replace existing wall board, ceramic wall tile and floor tile, ceiling tile and grid system, toilet partitions, counter tops, toilet, sink fixtures and light fixtures. No egress affected, no sprinkler work, no fire alarm work. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
