INTREN 75 Webster ST
Sector: Residential • Location: East Boston, Massachusetts, United States of America
Source: City of Boston
replace damaged or missing door moldings. New bathroom vanity and toilet. replace 4 closet doors. Tub surround over existing tiles. New kitchen cabinets over stove and sink. Replace ceiling lights. Add microwave over the stove. Replace any damaged outlets. Paint apartment throughout. Replace any damaged ceiling tiles. new pergo flooring throughout
- Status
- Prospective
- Sector
- Residential, Commercial, Government
- Location
- East Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about INTREN 75 Webster ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | replace damaged or missing door moldings. New bathroom vanity and toilet. replace 4 closet doors. Tub surround over existing tiles. New kitchen cabinets over stove and sink. Replace ceiling lights. Add microwave over the stove. Replace any damaged outlets. Paint apartment throughout. Replace any damaged ceiling tiles. new pergo flooring throughout |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | East Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- CR 347/ DAVID'S HOME CHURCH RD @ SCULL SHOAL CREEK
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
