Intrenchment Creek Viaduct Rehabilitation
Sector: Bridge • Location: Georgia, United States of America (USA)
Source: Atlanta Watershed
Over 100 years old, the Intrenchment Creek Viaduct is a 48-inch pipeline that conveys sanitary sewer flows to the Intrenchment Creek Water Reclamation Center. The pipeline was constructed as a cast-in-place, reinforced concrete viaduct structure to create an elevated creek crossing. The aerial portion of the structure span is approximately 300 feet and is 40 feet above Parker Creek. Over time, the
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete / construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Over 100 years old, the Intrenchment Creek Viaduct is a 48-inch pipeline that conveys sanitary sewer flows to the Intrenchment Creek Water Reclamation Center. The pipeline was constructed as a cast-in-place, reinforced concrete viaduct structure to create an elevated creek crossing. The aerial portion of the structure span is approximately 300 feet and is 40 feet above Parker Creek. Over time, the viaduct has developed structural deficiencies and currently has evidence of severe cracks in its wall foundation that warrant repair/rehabilitation to restore the structural integrity of the pipeline. The scope of this project includes: Phase 1: Conducting a structural evaluation, surveying, and non-destructive testing of the viaduct: Determining the size, strength and reinforcement of supporting structure Completing as-built survey of the viaduct and the retaining walls Determining the remaining strength of the concrete cover around the pipe and rebar Determining the size of the foundations supporting the structure Phase 2: Rehabilitating the viaduct as needed: Installing either a Cured-in-Place pipe (CIPP) or PVC Spiral Wound Liner Inserting a fiber glass pipe into the existing sewer Grouting the annular space between the existing structure and the new pipe Justification: Enhances flow capacity of the viaduct Reduces Infiltration/Inflow or extraneous flows into the sewer system Contributes to reductions in sanitary sewer overflows Provides adequate conveyance capacity for existing and new customers |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |