Over 100 years old, the Intrenchment Creek Viaduct is a 48-inch pipeline that conveys sanitary sewer flows to the Intrenchment Creek Water Reclamation Center. The pipeline was constructed as a cast-in-place, reinforced concrete viaduct structure to create an elevated creek crossing. The aerial portion of the structure span is approximately 300 feet and is 40 feet above Parker Creek. Over time, the

Status
Closed
Sector
Bridge, Cement, Commercial, Steel, Waste Processing and Treatment, Water Supply and Storage, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Atlanta Watershed

ConstructChat

Ask ConstructChat about Intrenchment Creek Viaduct Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Intrenchment Creek Viaduct Rehabilitation” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Participants

Sponsoring Agency

Status

Original status

complete / construction

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Over 100 years old, the Intrenchment Creek Viaduct is a 48-inch pipeline that conveys sanitary sewer flows to the Intrenchment Creek Water Reclamation Center. The pipeline was constructed as a cast-in-place, reinforced concrete viaduct structure to create an elevated creek crossing. The aerial portion of the structure span is approximately 300 feet and is 40 feet above Parker Creek. Over time, the viaduct has developed structural deficiencies and currently has evidence of severe cracks in its wall foundation that warrant repair/rehabilitation to restore the structural integrity of the pipeline. The scope of this project includes: Phase 1: Conducting a structural evaluation, surveying, and non-destructive testing of the viaduct: Determining the size, strength and reinforcement of supporting structure Completing as-built survey of the viaduct and the retaining walls Determining the remaining strength of the concrete cover around the pipe and rebar Determining the size of the foundations supporting the structure Phase 2: Rehabilitating the viaduct as needed: Installing either a Cured-in-Place pipe (CIPP) or PVC Spiral Wound Liner Inserting a fiber glass pipe into the existing sewer Grouting the annular space between the existing structure and the new pipe Justification: Enhances flow capacity of the viaduct Reduces Infiltration/Inflow or extraneous flows into the sewer system Contributes to reductions in sanitary sewer overflows Provides adequate conveyance capacity for existing and new customers

Budget

Location

Country

United States of America (USA)

State

Georgia

Source

Source reliability

High

Source

Atlanta Watershed

URL

More Details

Record type

Project

Sector

Bridge, Cement, Commercial, Steel, Waste Processing and Treatment, Water Supply and Storage, Government

Article published date

2023-11-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project