Intrenchment Creek Viaduct Rehabilitation

Sector: Bridge • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Project
Complete / Construction

Over 100 years old, the Intrenchment Creek Viaduct is a 48-inch pipeline that conveys sanitary sewer flows to the Intrenchment Creek Water Reclamation Center. The pipeline was constructed as a cast-in-place, reinforced concrete viaduct structure to create an elevated creek crossing. The aerial portion of the structure span is approximately 300 feet and is 40 feet above Parker Creek. Over time, the

Project Information FAQ

Project Information

5 Q
The project “Intrenchment Creek Viaduct Rehabilitation” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete / construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Over 100 years old, the Intrenchment Creek Viaduct is a 48-inch pipeline that conveys sanitary sewer flows to the Intrenchment Creek Water Reclamation Center. The pipeline was constructed as a cast-in-place, reinforced concrete viaduct structure to create an elevated creek crossing. The aerial portion of the structure span is approximately 300 feet and is 40 feet above Parker Creek. Over time, the viaduct has developed structural deficiencies and currently has evidence of severe cracks in its wall foundation that warrant repair/rehabilitation to restore the structural integrity of the pipeline. The scope of this project includes: Phase 1: Conducting a structural evaluation, surveying, and non-destructive testing of the viaduct: Determining the size, strength and reinforcement of supporting structure Completing as-built survey of the viaduct and the retaining walls Determining the remaining strength of the concrete cover around the pipe and rebar Determining the size of the foundations supporting the structure Phase 2: Rehabilitating the viaduct as needed: Installing either a Cured-in-Place pipe (CIPP) or PVC Spiral Wound Liner Inserting a fiber glass pipe into the existing sewer Grouting the annular space between the existing structure and the new pipe Justification: Enhances flow capacity of the viaduct Reduces Infiltration/Inflow or extraneous flows into the sewer system Contributes to reductions in sanitary sewer overflows Provides adequate conveyance capacity for existing and new customers

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data