Intrenchment Creek Viaduct Rehabilitation
Complete / construction · Georgia
Source: Atlanta Watershed
Over 100 years old, the Intrenchment Creek Viaduct is a 48-inch pipeline that conveys sanitary sewer flows to the Intrenchment Creek Water Reclamation Center. The pipeline was constructed as a cast-in-place, reinforced concrete viaduct structure to create an elevated creek crossing. The aerial portion of the structure span is approximately 300 feet and is 40 feet above Parker Creek. Over time, the
- Status
- Closed
- Sector
- Bridge, Cement, Commercial, Steel, Waste Processing and Treatment, Water Supply and Storage, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Atlanta Watershed
ConstructChat
Ask ConstructChat about Intrenchment Creek Viaduct Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete / construction |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Over 100 years old, the Intrenchment Creek Viaduct is a 48-inch pipeline that conveys sanitary sewer flows to the Intrenchment Creek Water Reclamation Center. The pipeline was constructed as a cast-in-place, reinforced concrete viaduct structure to create an elevated creek crossing. The aerial portion of the structure span is approximately 300 feet and is 40 feet above Parker Creek. Over time, the viaduct has developed structural deficiencies and currently has evidence of severe cracks in its wall foundation that warrant repair/rehabilitation to restore the structural integrity of the pipeline. The scope of this project includes: Phase 1: Conducting a structural evaluation, surveying, and non-destructive testing of the viaduct: Determining the size, strength and reinforcement of supporting structure Completing as-built survey of the viaduct and the retaining walls Determining the remaining strength of the concrete cover around the pipe and rebar Determining the size of the foundations supporting the structure Phase 2: Rehabilitating the viaduct as needed: Installing either a Cured-in-Place pipe (CIPP) or PVC Spiral Wound Liner Inserting a fiber glass pipe into the existing sewer Grouting the annular space between the existing structure and the new pipe Justification: Enhances flow capacity of the viaduct Reduces Infiltration/Inflow or extraneous flows into the sewer system Contributes to reductions in sanitary sewer overflows Provides adequate conveyance capacity for existing and new customers |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source reliability | High |
Source | Atlanta Watershed |
URL |
More Details
Record type | Project |
Sector | Bridge, Cement, Commercial, Steel, Waste Processing and Treatment, Water Supply and Storage, Government |
Article published date | 2023-11-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America (USA)
- Auburn Avenue Historic and Cultural Information Project
- A Bridge Home Projects
- Peachtree Creek – South Fork Green Infrastructure – Cheshire Bridge Road
- GDOT/Intra-Government Agreements Utility Relocation
- Broadway over I-44 bridge and ramp replacement
- 86 Bridge Replacement over Long Creek Arm of Table Rock Lake
- Northeast Safe and Sound Bridge Rehabilitations
- Pulaski County Route T Bridge Rehabilitation
