Invema Self Supply Solar and Energy Efficiency - Amendment
Closed · Honduras
Source: Inter-American Development Bank (IADB)
The objective of the Project is to generate renewable electricity for self-consumption through approximately 928kW of photovoltaic solar panels mounted on the rooftops of Invema¿s buildings. The loan will also incorporate investments in energy efficiency and recycling equipment.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT), Government
- Location
- Honduras
- Updated
- 22 Jul 2026
- Source
- Inter-American Development Bank (IADB)
ConstructChat
Ask ConstructChat about Invema Self Supply Solar and Energy Efficiency - Amendment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Project is to generate renewable electricity for self-consumption through approximately 928kW of photovoltaic solar panels mounted on the rooftops of Invema¿s buildings. The loan will also incorporate investments in energy efficiency and recycling equipment. |
Original sector | ENERGY |
Budget |
Location
Country | Honduras |
Source
Source | Inter-American Development Bank (IADB) |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Government |
Article published date | 2025-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
