Invermere - Toby Creek Dike Improvements

Sector: Water Supply and Storage • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

Invermere has experienced flooding and ice jam events in the areas adjacent to Toby Creek. Invermere has completed the Toby Creek Flood Risk Assessment and Mapping to update Toby Creek flood maps and risk assessment: the hydraulic model suggested the climate adjusted 1:200-year flows are mostly contained within the existing dike structure with the exception of a few reaches where water levels are

Project Information FAQ

Project Information

4 Q
The project “Invermere - Toby Creek Dike Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Invermere has experienced flooding and ice jam events in the areas adjacent to Toby Creek. Invermere has completed the Toby Creek Flood Risk Assessment and Mapping to update Toby Creek flood maps and risk assessment: the hydraulic model suggested the climate adjusted 1:200-year flows are mostly contained within the existing dike structure with the exception of a few reaches where water levels are expected to reach and overtop the dike structure. There is no freeboard along the dike system. Following EGBC guidelines, the freeboard elevation should be the climate adjusted 200-year water surface elevation plus 0.6m. With this project Invermere intends to raise the dike elevations along Toby Creek to the climate adjusted 1:200-year flows plus 0.6m of freeboard. There are four locations where the dike elevations need to be raised to contain the climate adjusted 1:200-year flows: the north end of the dike where the dike meets Panorama Drive, two areas in the middle of the structure alignment, and location at the furthest south part of the dike. Improving the dike elevation at the south end will help mitigate against potential ice jam conditions as that is where flows have overtopped the dike previously. With this project the dike system will also be provided with the provincially required 0.6m of freeboard. The project consists of raising the dike systems along Toby Creek including: - Approx. 300m North End dike raising to climate adjusted 1:200-year flows plus 0.6m of freeboard. - Approx. 100m South End dike raising to climate adjusted 1:200-year flows plus 0.6m of freeboard. - Approx. 50m Central dike raising to climate adjusted 1:200-year flows plus 0.6m of freeboard. - Approx. 600m dike raising to the 0.6m freeboard. - Approx. 120m perimeter berm construction. - reconstruction of the existing trail on top of the dike. - vegetation restoration. It is expected that the dike raising would mostly consist of placing imported rip rap on top of the existing structure.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data