Invermere - Toby Creek Dike Improvements
Sector: Water Supply and Storage • Location: British Columbia, Canada
Source: Infrastructure Canada
Invermere has experienced flooding and ice jam events in the areas adjacent to Toby Creek. Invermere has completed the Toby Creek Flood Risk Assessment and Mapping to update Toby Creek flood maps and risk assessment: the hydraulic model suggested the climate adjusted 1:200-year flows are mostly contained within the existing dike structure with the exception of a few reaches where water levels are
- Status
- Under Construction
- Sector
- Water Supply and Storage
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Invermere - Toby Creek Dike Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Invermere has experienced flooding and ice jam events in the areas adjacent to Toby Creek. Invermere has completed the Toby Creek Flood Risk Assessment and Mapping to update Toby Creek flood maps and risk assessment: the hydraulic model suggested the climate adjusted 1:200-year flows are mostly contained within the existing dike structure with the exception of a few reaches where water levels are expected to reach and overtop the dike structure. There is no freeboard along the dike system. Following EGBC guidelines, the freeboard elevation should be the climate adjusted 200-year water surface elevation plus 0.6m. With this project Invermere intends to raise the dike elevations along Toby Creek to the climate adjusted 1:200-year flows plus 0.6m of freeboard. There are four locations where the dike elevations need to be raised to contain the climate adjusted 1:200-year flows: the north end of the dike where the dike meets Panorama Drive, two areas in the middle of the structure alignment, and location at the furthest south part of the dike. Improving the dike elevation at the south end will help mitigate against potential ice jam conditions as that is where flows have overtopped the dike previously. With this project the dike system will also be provided with the provincially required 0.6m of freeboard. The project consists of raising the dike systems along Toby Creek including: - Approx. 300m North End dike raising to climate adjusted 1:200-year flows plus 0.6m of freeboard. - Approx. 100m South End dike raising to climate adjusted 1:200-year flows plus 0.6m of freeboard. - Approx. 50m Central dike raising to climate adjusted 1:200-year flows plus 0.6m of freeboard. - Approx. 600m dike raising to the 0.6m freeboard. - Approx. 120m perimeter berm construction. - reconstruction of the existing trail on top of the dike. - vegetation restoration. It is expected that the dike raising would mostly consist of placing imported rip rap on top of the existing structure. |
Original sector | Climate Resilience |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project