The planned new project, Electricity Distribution I Investment Program, is intended to serve the energy-efficient rehabilitation and expansion of the dilapidated electricity distribution infrastructure in Albania. The program objectives are (i) to increase electricity distribution capacities, (ii) to reduce CO2 emissions and (iii) to improve the security and quality of supply. The overarching deve

Project Information FAQ

Project Information

5 Q
The project “Investment program electricity distribution I” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Albania. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The planned new project, Electricity Distribution I Investment Program, is intended to serve the energy-efficient rehabilitation and expansion of the dilapidated electricity distribution infrastructure in Albania. The program objectives are (i) to increase electricity distribution capacities, (ii) to reduce CO2 emissions and (iii) to improve the security and quality of supply. The overarching development policy objectives of the project are to make a contribution to the sustainable economic development of Albania, as well as to reduce greenhouse gas emissions and thus to contribute to global climate protection. The target group is the population of Albania connected to the electricity grid. The new project is designed as an open program. At the time of the review, the following possible measures could be identified (1) Upgrade/expansion of the network control room for the electricity distribution system with systems for monitoring, control and data acquisition (Supervisory Control and Data Acquisition System, SCADA), network management (Distribution Management System, DMS), load distribution (Load Dispatch System) and network maintenance at distribution level 20 kV; Furthermore, it is expected that... Instrument transformers (current and voltage transformers) were installed, the existing telecommunications system was renewed if necessary and an integrated IT system was introduced. (2) Construction of a new 110/20 kV substation, expansion of the medium voltage, installation of low-loss transformers (3) Adaptation of the lines and equipment of the medium-voltage network in selected regions to a uniform voltage level of 20 kV (4) Consulting services Taking into account the program objectives and the priorities of the partners, additional or, if necessary, alternative components can be financed within the framework of the program. To support the program sponsor in the preparation, introduction and operation of the network control center, consulting and training measures, particularly for component 1, are planned as part of an accompanying measure (BM). The estimated total cost of the project is around EUR 32 million. The borrower is the Republic of Albania, represented by the Ministry of Finance, which will pass the funds on to the program sponsor OSHEE (Operatori I Shperndarjes Energjise Elektrike). The program is financed by a development loan (low-interest loan) of EUR 30 million. The federal guarantee framework is used to 80%. The Republic of Albania provides a transaction-related state guarantee as security. The sponsor's significant own contributions consist of the assumption of customs duties and taxes as well as measures to avoid, reduce and compensate for environmental and social impacts during the construction and operation of the facilities. In addition, the sponsor's significant own contribution consists of the rehabilitation of the 220/400 V low-voltage networks using ABC cables, which are connected to the 20 kV sub-networks converted in the program. A grant of EUR 2 million is planned for the accompanying measure.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data