The Brazilian company Inxu Geradora e Comercializadora de Energia Eletrica S.A. was granted the authorization to build a small hydro power plant (PCH Inxu) located in the state of Mato Grosso (20.6 MW in total capacity). The 30-year contract was signed with the regulatory agency ANEEL in September 2011.

Inxu Geradora committed to invest US$ 56.5 million (BRL 133 million) in the construction of

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Government, Hydro, Steel, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Inxu Small Hydro Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Inxu Small Hydro Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Inxu Geradora e Comercializadora de Energia Eletrica S.A. was granted the authorization to build a small hydro power plant (PCH Inxu) located in the state of Mato Grosso (20.6 MW in total capacity). The 30-year contract was signed with the regulatory agency ANEEL in September 2011. Inxu Geradora committed to invest US$ 56.5 million (BRL 133 million) in the construction of the power plant. In April 2013, the state-owned bank BNDES approved a US$ 42.5million (BRL 100 million) to finance the project. In August 2010, the power plant took part in the competitive bidding process to sell electricity to the regulated wholesale market starting in 2013 (20-year power purchase agreement was signed guaranteeing the sale of electricity to the national grid). The average tariff offered in the bidding process by the power plants was US$ 65.8/MWh (BRL 129.93/MWh). In April 2012, the sponsor began the construction works. As of April 2014, operations were expected to begin by September 2014. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. In 2012, the company applied for carbon credits.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government, Hydro, Steel, Manufacturing (Industrial)

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project