logo
ProjectClosed

Iona Township Box Culvert Replacement

One of 10,000+ projects Taiyo tracks in Minnesota.

Source: Dodge

Iona Township Box Culvert Replacement Estimated quantities are: Remove Existing Bridge 1 Each Aggregate Surface CL 1 345 Ton Excavation Common 44 Cu Yd Common Embankment 2,815 Cu Yd16x8 Precast Conc Box Culv CL IV 80 Lin Ft16x8 Type I Precast Conc Box Culv End Sec 2 Each Aggregate Backfill LV 1,110 Cu Yd Rock Bedding CV 150 Cu Yd Random Riprap CL IV 105 Ton Sediment Control Log, Type Compost 80 Li

Status
Closed
Sector
Water Supply and Storage, Commercial, Bridge, Waste Processing and Treatment, Government
Location
Slayton, Minnesota, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Iona Township Box Culvert Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Iona Township Box Culvert Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Slayton, Minnesota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Iona Township Box Culvert Replacement Estimated quantities are: Remove Existing Bridge 1 Each Aggregate Surface CL 1 345 Ton Excavation Common 44 Cu Yd Common Embankment 2,815 Cu Yd16x8 Precast Conc Box Culv CL IV 80 Lin Ft16x8 Type I Precast Conc Box Culv End Sec 2 Each Aggregate Backfill LV 1,110 Cu Yd Rock Bedding CV 150 Cu Yd Random Riprap CL IV 105 Ton Sediment Control Log, Type Compost 80 Lin Ft Rolled Erosion Prevention Category 25 4,880 Sq Yd Seeding 1 Acre

Procurement method

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Slayton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Bridge, Waste Processing and Treatment, Government

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project