Iowa 37 Bridge Replacement over Boyer River
Sector: Bridge • Location: Iowa, United States
Source: Iowa Department of Transportation (.gov)
Proposed bridge replacement on Iowa 37 over the Boyer River just west of U.S. 30 in Harrison County. Construction is planned to start in spring 2028 and complete by fall 2028. Traffic will be detoured during construction with an accelerated bridge construction technique to reduce detour duration. Access to properties will be maintained at all times.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Proposed bridge replacement on Iowa 37 over the Boyer River just west of U.S. 30 in Harrison County. Construction is planned to start in spring 2028 and complete by fall 2028. Traffic will be detoured during construction with an accelerated bridge construction technique to reduce detour duration. Access to properties will be maintained at all times. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
