Iowa 9 / WIS 82 Mississippi River Bridge Demolition
Sector: Bridge • Location: Lansing, Iowa, United States
Source: Iowa Department of Transportation (.gov)
The demolition involves the implosion and removal of the main section of the existing Mississippi River Bridge at Lansing to allow construction of the new crossing, which is planned to open in 2027. The implosion was rescheduled to December 19, 2025, with safety plans and restricted zones established to ensure public and contractor safety.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The demolition involves the implosion and removal of the main section of the existing Mississippi River Bridge at Lansing to allow construction of the new crossing, which is planned to open in 2027. The implosion was rescheduled to December 19, 2025, with safety plans and restricted zones established to ensure public and contractor safety. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
