IPTO DODECANESE INTERCONNECTION
One of 4,657 projects Taiyo tracks in Greece.
Source: European Investment Bank (EIB)
Interconnection of the islands of Kos, Rhodes and Karpathos with the Hellenic Electricity Transmission System. The project consists of two converter stations (Corinth and Kos), two High-Voltage-Direct-Current submarine cables (Corinth to Kos), two Gas-Insulated Switchgear substations (Kos and Karpathos), four submarine cables (Kos to Rhodes, and Rhodes to Karpathos), and an overhead transmission l
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT), Government
- Location
- Greece
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about IPTO DODECANESE INTERCONNECTION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under appraisal |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Interconnection of the islands of Kos, Rhodes and Karpathos with the Hellenic Electricity Transmission System. The project consists of two converter stations (Corinth and Kos), two High-Voltage-Direct-Current submarine cables (Corinth to Kos), two Gas-Insulated Switchgear substations (Kos and Karpathos), four submarine cables (Kos to Rhodes, and Rhodes to Karpathos), and an overhead transmission line in Corinth. |
Original sector | Energy |
Location
Country | Greece |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
