IPTO NORTH EAST AEGEAN INTERCONNECTION
Sector: Power Generation (CCGT) • Location: Greece
Source: European Investment Bank (EIB)
Electricity interconnection of the islands of Lemnos, Lesvos, Chios, Samos, and Skyros to the mainland transmission grid (via Nea Santa in the area of Thrace to the north, and via Aliveri in the Evia island to the east), and to the Dodecanese islands grid (via Mastichari in the Kos island to the south). The connection will be mainly established through alternating current (AC) 150 kV cable interco
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government
- Location
- Greece
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about IPTO NORTH EAST AEGEAN INTERCONNECTION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under appraisal |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Electricity interconnection of the islands of Lemnos, Lesvos, Chios, Samos, and Skyros to the mainland transmission grid (via Nea Santa in the area of Thrace to the north, and via Aliveri in the Evia island to the east), and to the Dodecanese islands grid (via Mastichari in the Kos island to the south). The connection will be mainly established through alternating current (AC) 150 kV cable interconnectors and 150 kV gas insulated (GIS) substations. |
Original sector | Energy |
Location
Country | Greece |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project