IPTO NORTH EAST AEGEAN INTERCONNECTION
Signed · Greece
Source: European Investment Bank (EIB)
The project will connect the island regions of Lemnos, Lesvos, Chios, Samos and Skyros to the mainland transmission grid through Nea Santa in Thrace to the north and Aliveri on Evia to the east. It will also link them to the Dodecanese islands grid via Mastichari on Kos to the south. The connection will primarily use 150 kV alternating current (AC) cable interconnectors and 150 kV gas-insulated su
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Government
- Location
- Greece
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about IPTO NORTH EAST AEGEAN INTERCONNECTION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will connect the island regions of Lemnos, Lesvos, Chios, Samos and Skyros to the mainland transmission grid through Nea Santa in Thrace to the north and Aliveri on Evia to the east. It will also link them to the Dodecanese islands grid via Mastichari on Kos to the south. The connection will primarily use 150 kV alternating current (AC) cable interconnectors and 150 kV gas-insulated substations (GIS). |
Original sector | Energy |
Location
Country | Greece |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2026-01-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
